TWO STOREY HVAC AND MEP PROJECT, DUBLIN 7

Dublin

Two Storey HVAC and MEP Project, Dublin 7

Client: Proprietary Information

Budget: €N/A

Mastertech recently completed a project for a client in Dublin 7, which included a full scope of HVAC and MEP work. 

Work was carried out throughout the building, including new installations and changes to existing services, making the building more sustainable – new fan coil units have modulating fans which make them more efficient. Additionally, the new Air Handling Unit is an A rated unit, as it recycles and reuses its own air.

There were a variety of facilities within the building that required services. The full works included: 

Ground Floor:

  • Soils & Waste – Installation of a soils and waste system for the ground floor to accommodate welfare facilities and kitchenette. This system also accommodated a condensation line to facilitate heating and cooling appliances.
  • Air conditioning system – Supply and installation of a new Daikin VRF AC system to service Daikin FCU’s withing the ceiling void for heating and cooling purposes, along with new Daikin comms room AC system.
  • Domestic Water services – Supply and installation of a domestic water services system composing of a mains water supply for the kitchenette and a cold-water supply to supply the welfare facilities.
  • Cold Water Storage tank – Supply and installation of a new sectional cold water storage tank on the roof to supply the ground floor.
  • Ventilation Services – Supply and installation of a new ventilation system comprising of a new AHU on the roof, an extract fan for the toilets and new grills for supply and extract.
  • BMS – Alteration of the existing BMS system to allow for monitoring of AC systems and operation of above ventilation equipment.

Second Floor:

  • Soils & Waste – Installation of a soils and waste system for the second floor to accommodate welfare facilities and canteen. This system also accommodated a condensation line to facilitate heating and cooling appliances.
  • Air conditioning system – Supply and installation of a new Daikin comms room AC system.
  • LTHW & CHW services – Alteration of the existing LTHW & CHW system for heating and cooling to new and existing FCU’s within the ceiling void.
  • Domestic Water services – Supply and installation of a domestic water services system composing of a mains water supply for the canteen and a cold-water supply to supply the welfare facilities.
  • Ventilation Services – Alterations were made to the existing ventilation system to accommodate new and existing FCU’s and grills for distribution of air around the floor plate.
  • BMS – Alterations were made to the existing BMS system to allow for automation of existing and new services.

Take a look at the images below to see how the completed project.

Get in touch if your facility requires any of the above services, and talk to us about the options available. 

Other Projects

Mechanical Fan Coils, Dublin

MECHANICAL FAN COIL UNITS, DUBLIN

Dublin

Mechanical Grille Installation, Grange Castle

MECHANICAL GRILLE INSTALLATION, GRANGE CASTLE

South Dublin