PRODIECO OFFICE UPGRADE
Tallaght, Co. Dublin
Complete Mechanical and Electrical Upgrade
Project Duration: 24 weeks
This project comprised of a complete office upgrade at Prodieco House, Cookstown Industrial Estate, Tallaght, Co. Dublin.
The locations of interest for these works include:
• Ground & First Floor Area Fitout
The scope of works for this project included Mechanical:
• Isolation, decommission and make safe (or remove where necessary) of existing equipment.
• Supply & Install of New AHU’s and Condensers (Daikin Models) o Including VSD’s and Carbon Dioxide Monitoring Modules.
• Supply & Install New VRF Air Conditioning System including:
Mechanical:
- AC Units: (Daikin)
- Branch Selector Boxes.
- Condensate Pipework & Fittings
- All Supports/Brackets Required.
- Installation of Cold-Water Services (CWS), Hot Water Services (HWS) and Hot Water Services Return (HWSR) to the Kitchenette.
- Installation of Complete Ventilation System including all Air Terminal Devices and Equipment required (i.e. Grilles/Diffusers/Louvres/Fire Dampers Etc.)
- Full Commissioning of Systems.
- Handover and Demonstration to Client.
Electrical:
- General Services Installation
- Data Installation
- Mechanical Services Power Supply
- General and Emergency Lighting Installation