Cushman & Wakefield

Dublin 4

Dublin Office Refurbishment

Full Mechanical & Electrical Design & Build Package consisting of HVAC, Plumbing, Lighting, Security, Fire Alarm & Data.

Client: Cushman & Wakefield

Budget: €150,000.00

Mastertech worked closely with the Main Contractor (MAC Group), the location of these works were on the Ground and Second Floors.
  • Alterations to existing systems to accommodate new layouts.

  • Removal of all redundant equipment.

  • Supply and Installation of new pipework routes to serve Tea Stations and Shower Rooms.

  • Supply & Installation of new Wall Mounted AC Unit and Condenser for the Comms Room.
  • Complete Electrical Package including power supplies for all
    New Mechanical Devices and Equipment, Supply & Installation
    of Lighting Fixtures, Security Systems, Fire Alarm and Data
    Cables.

  • A full Water Treatment was carried out consisting of a system flush and re-chlorination of the system.

  • All new equipment installed by Mastertech was commissioned
    by our specialists, commissioning certs were compiled into an
    Operation & Maintenance Manual ready for Handover to the
    Client.

Other Projects

2B7OZE5HH54VBOSN3SS2HTTOGA (1)

Decathlon

Dublin 11

7EGQPS7ODEUJQ5NR5PNGCK3OPA

The Marker Hotel

Dublin 2

DSC_3189-scaled-aspect-ratio-16-9-scaled

Irish Distillers

Dublin 4

CushmanWakefield06-scaled

Cushman & Wakefield

Dublin 4