HAVAS

48 – 50 Cuffe Street, Dublin 2, Co. Dublin

Design & Build Package for New Offices

Project Duration: 6 Weeks

Full Mechanical & Electrical Design & Build Package for HAVAS’ New Offices in Cuffe Street, Dublin.

Client: HAVAS

Budget: € 220,000.00

Mastertech worked closely with the Main Contractor (MAC Group), to execute the project as efficiently as possible. The location of the works were on the Ground, First & Third Floors.

  • Works commenced on Havas with the strip out of all redundant equipment.
  • Mastertech made modifications to existing ductwork and installed new ductwork to suit the new layout & VRF System. This included new Primary & Secondary Ductwork, Volume Control Dampers, and Fire Dampers.
  • All Grilles and Louvres were supplied and installed by Mastertech.
  • Mastertech supplied and installed a new Daikin VRF System, including Outdoor Condensers, Indoor Units and Refrigerant
    Pipework.
  • Mastertech installed power wiring to all new Mechanical
    Equipment and associated devices.
  • A full water treatment was carried out including Flushing of Pipework, Dosing and Chlorination.
  • All new equipment installed by Mastertech was commissioned by our specialists, commissioning certs were compiled into an Operation & Maintenance Manual ready for Handover to the Client.

Other Projects

HAVAS

HAVAS

48 – 50 Cuffe Street, Dublin 2, Co. Dublin

Navan Hospital

OUR LADY’S HOSPITAL, NAVAN

Moathill, Navan, Co. Meath

SONICA FIRST LANDINGS

FIRST LANDINGS - SKERRIES

Ardla, Skerries, Co. Dublin

GUINNESS ENTERPRISE CENTRE

GUINNESS ENTERPRISE CENTRE

Taylor’s Lane, Dublin 8, Co. Dublin

North Dublin

North Dublin Client

North Dublin

Carton House

Carton House

Kildare