GUINNESS ENTERPRISE CENTRE

Taylor’s Lane, Dublin 8, Co. Dublin

Full Mechanical Package

Project Duration: 8 Months

Full Mechanical Package consisting of HVAC, Plumbing & Sanitary ware.

The GEC opened its doors in 2000 and has since become Ireland’s #1 entrepreneurial super hub.

SECTOR: Enterprise

SCOPE: Full Mechanical package

Client: Flynn & GEC

Sector:

Budget: € 745,000.00

The Guinness Enterprise Centre (GEC), established in 2000, stands as Ireland’s premier entrepreneurial super hub. As a catalyst for innovation and entrepreneurship, GEC provides a dynamic environment for startups and established companies alike.

In its quest to continually improve its facilities, the GEC embarked on a mission to enhance its infrastructure with a full mechanical package, including HVAC, plumbing, and sanitary ware, spanning an ambitious 8-month timeline.

The GEC required state-of-the-art mechanical systems to ensure an optimal working environment for its diverse community of entrepreneurs and engaged Mastertech to support their plans.

The project’s strict 8-month duration demanded meticulous planning and execution to minimise disruptions to GEC’s daily operations. Mastertech worked closely with the Main Contractor (Flynns), the location of works were on the Ground, Third, Fourth & Roof Levels.

Our multidisciplinary team of mechanical engineers, plumbers, and sanitary experts collaborated closely to design and implement the mechanical package. The project was meticulously phased to accommodate GEC’s operational needs and minimise downtime.

The successful implementation of the full mechanical package enhanced the GEC’s infrastructure, ensuring a comfortable and efficient workspace for its entrepreneurial community. The project was completed on time, demonstrating a seamless collaboration between all stakeholders.

This 8-month project exemplified the dedication to innovation and entrepreneurial spirit that defines the Guinness Enterprise Centre. It stands as a testament to the GEC’s commitment to supporting and empowering Ireland’s brightest minds. 

  • Alterations to existing mechanical services to accommodate new extension. This included rerouting of pipework, changeover of water tanks and relocation of extract ductwork.
  •  All redundant materials were removed from site to allow works to commence.
  • Mastertech worked closely with the consulting engineers to aid with the design of the new HVAC and Plumbing Systems.
  • Mastertech Supplied and Installed a New Daikin VRF Air
    Conditioning and Heat Recovery System to meet specification. A total of 9no. Outdoor Condensers were installed on the Roof Level and Ground Floor Atrium. These condensers piped to 3no. VRF Systems consisting of 62no. Indoor AC Units. 14no. Heat Recovery Units were installed to Aid the VRF System in Heating & Cooling.
  • Mastertech Supplied & Installed all new Ventilation Ductwork, VCD’s, Grilles, Louvres and Fire Dampers.
  • A New 32,000 Litre Water Storage Tank was Supplied & Installed by Mastertech along with a new Wilo Mains Water Booster Pump and Cold-Water Booster Pump.
  • A full Water Treatment was carried out consisting of a system flush and re-chlorination of the system.
  • All new equipment installed by Mastertech was commissioned by our specialists, commissioning certs were compiled into an Operation & Maintenance Manual ready for Handover to the Client.

Other Projects

HAVAS

HAVAS

48 – 50 Cuffe Street, Dublin 2, Co. Dublin

Navan Hospital

OUR LADY’S HOSPITAL, NAVAN

Moathill, Navan, Co. Meath

SONICA FIRST LANDINGS

FIRST LANDINGS - SKERRIES

Ardla, Skerries, Co. Dublin

GUINNESS ENTERPRISE CENTRE

GUINNESS ENTERPRISE CENTRE

Taylor’s Lane, Dublin 8, Co. Dublin

North Dublin

North Dublin Client

North Dublin

Carton House

Carton House

Kildare