Decathlon

Dublin 11

Helping make sports accessible for the many

Full Mechanical Package consisting of HVAC, Plumbing & BMS.

Client: Decathlon

Budget: € 500,000.00

Mastertech worked closely with the Main Contractor (Mannings), the location of works were on the Ground, First & Roof Levels.
  • Mastertech Supplied and Installed a Daikin VRF Air Conditioning
    and Heat Recovery System. A total of 2no. Condensers were
    installed, consisting of 13no. Indoor AC Units. 4no. Daikin Heat
    Recovery Units were supplied and installed to aid the VRF System
    in Heating & Cooling.

  • 2no. SystemAir Air Handling Units were Supplied and Installed by
    Mastertech for Heating & Cooling of Primary Air.

  • Mastertech Supplied & Installed all new Ventilation Ductwork,
    VCD’s, Grilles, Louvres and Fire Dampers.
  • Mastertech Supplied and Installed new Water Services Pipework to
    all Kitchen & Tea Station Sinks / Appliances. To provide Hot Water,
    Under sink Water Heaters were installed within cupboards.

  • A new system of uPVC Soils & Waste Pipework was Supplied and
    Installed by Mastertech.

  • All new equipment installed by Mastertech was commissioned by
    our specialists, commissioning certs were compiled into a detailed
    Operation & Maintenance Manual ready for Handover to the
    Client.

Other Projects

2B7OZE5HH54VBOSN3SS2HTTOGA (1)

Decathlon

Dublin 11

7EGQPS7ODEUJQ5NR5PNGCK3OPA

The Marker Hotel

Dublin 2

DSC_3189-scaled-aspect-ratio-16-9-scaled

Irish Distillers

Dublin 4

CushmanWakefield06-scaled

Cushman & Wakefield

Dublin 4