DECATHLON, O'CONNELL ST

O'Connell St, Dublin

Full Mechanical Package

We recently completed the handover of Decathlon O’Connell St; we were the main MEP Contractor for the works which included subcontracted specialist services.

Systemair and Mitsubishi were the product suppliers for the HVAC systems installed by our MEP team.

SECTOR: Retail

SCOPE:

As the primary MEP contractor, Mastertech was responsible for the installation and integration of various systems, including:

  • HVAC Systems: Utilising products from Mitsubishi and Systemair.
  • Fire Safety: Installation of fire dampers from Safegard Systems.
  • Plumbing: Comprehensive pipework and fittings supplied by Hevac.
  • Specialist Services: Coordination with multiple subcontractors for specialised installations.

Client: Decathlon

Sector:

Budget: €900,000 approx

Mastertech recently completed a significant project as the main Mechanical, Electrical, and Plumbing (MEP) contractor for Decathlon’s new store on O’Connell Street. This project showcased Mastertech’s ability to deliver complex installations while coordinating with multiple subcontractors and suppliers.

The total value of the project was approximately €900,000, reflecting the extensive range of services and high-quality installations provided.

  • AIR CONDITIONING – Mitsubishi

  • AHU – Systemair

  • FIRE DAMPERS – Safegard Systems

  • PIPEWORK & FITTINGS – Hevac

  • HEAT PUMPS – Systemair

  •  EXTRACT FANS – Systemair

  • SMOKE EXTRACT SYSTEMS

  • HRU’S – Systemair

As the primary MEP contractor, Mastertech was responsible for the installation and integration of various systems, including:

  • HVAC Systems: Utilising products from Mitsubishi and Systemair.
  • Fire Safety: Installation of fire dampers from Safeguard Systems.
  • Plumbing: Comprehensive pipework and fittings supplied by Hevac.
  • Specialist Services: Coordination with multiple subcontractors for specialised installations.

HVAC System Installations

Air Conditioning – Mitsubishi

The air conditioning system, supplied by Mitsubishi, was a critical component of the project. Known for their efficiency and reliability, Mitsubishi systems ensured optimal climate control throughout the retail space. Mastertech’s team expertly installed and calibrated these units to meet Decathlon’s specifications, ensuring energy efficiency and customer comfort.

Air Handling Units (AHU) – Systemair

Systemair provided the Air Handling Units (AHUs), which are central to the ventilation system. These units were selected for their robust performance and efficiency, providing effective air distribution across the store. Mastertech’s technicians ensured seamless integration with existing infrastructure, optimising airflow and maintaining indoor air quality.

Fire Safety Installations

Fire Dampers – Safeguard Systems

Safety was paramount in the design and execution of this project. Fire dampers from Safeguard Systems were installed to prevent the spread of fire through the ventilation systems. These dampers are crucial for compartmentalisation in the event of a fire, enhancing the overall safety of the store.

Plumbing and Pipework

Pipework & Fittings – Hevac

The comprehensive plumbing network was constructed using high-quality pipework and fittings from Hevac. Mastertech’s expertise in plumbing ensured that all installations were both durable and efficient, supporting the store’s operational needs without compromising on quality.

Heating Solutions

Heat Pumps – Systemair

Systemair’s heat pumps were installed to provide an energy-efficient heating solution. These pumps are designed to transfer heat effectively, reducing energy consumption and operational costs. Mastertech’s team ensured that the installation met all performance standards and environmental guidelines.

Ventilation Systems

Extract Fans – Systemair

The installation of extract fans by Systemair played a vital role in maintaining indoor air quality. These fans effectively removed stale air and odours, contributing to a fresh and pleasant shopping environment.

Smoke Extract Systems

Mastertech installed advanced smoke extract systems to ensure safety in the event of a fire. These systems are designed to remove smoke quickly, maintaining visibility and reducing harm to occupants.

Heat Recovery Units (HRU)

– Systemair

The Heat Recovery Units installed by Mastertech help in maximising energy efficiency by recovering heat from the exhaust air and using it to precondition incoming fresh air. This system reduces energy consumption significantly, aligning with Decathlon’s sustainability goals.

Project Management and Coordination

Subcontractor Coordination

Mastertech successfully managed multiple subcontractors, ensuring that all specialist services were delivered on time and to the highest standards. This required meticulous planning and coordination, with regular progress meetings and quality checks to ensure all installations met the project’s stringent requirements.

Challenges and Solutions

  • Tight Deadlines: The project required completion within a strict timeline to meet Decathlon’s opening schedule. Mastertech addressed this by employing a dedicated project management team that streamlined processes and optimized resource allocation.
  • Complex Integration: Integrating various systems required a high level of technical expertise. Mastertech’s experienced team ensured seamless integration, utilizing advanced techniques and tools to coordinate different systems.
  • Safety Compliance: Meeting all safety regulations was a priority. Mastertech worked closely with safety consultants to ensure compliance with all fire safety and building regulations, conducting thorough testing and inspections.

Conclusion

Mastertech’s successful completion of the Decathlon O’Connell St project underscores its capability as a leading MEP contractor. By leveraging high-quality products from Systemair, Mitsubishi, and other suppliers, Mastertech delivered a state-of-the-art retail environment that meets both operational needs and safety standards.

The project not only highlights Mastertech’s technical expertise but also its commitment to excellence in project management and client satisfaction. This achievement sets a benchmark for future projects and strengthens Mastertech’s reputation in the industry.

 