Carton House

Kildare

Luxury Hotel with Full Mech & Elec Upgrade

One of the most luxurious 5-star hotels in Ireland, boasting a championship golf course, an award-winning restaurant & more.

Carton House Estate has focused on sustainable options during upgrade works. These sustainable improvements include the installation of LED energy saving lighting throughout the resort. A detailed site survey and testing to ensure best practices were applied to provide energy savings. Works were accompanied by upgrades to the HVAC Systems.

SECTOR: Hospitality

SCOPE: Full Mechanical & Electrical Upgrade package consisting of Lighting, HVAC, Plumbing, Fire Alarm, Security & Data, all while working within a live environment.

Client: Carton House

Sector:

Budget: € 4,000,000

Play Video

Mastertech worked closely with the Main Contractor (Parsons), the location of works were throughout multiple buildings including the Main House, Linden Tree Kitchen & Restaurant, Spa, and Basement.

  • Before commencing works in Carton House, Mastertech carried out extensive surveys of all existing Mechanical and Electrical Equipment. Any equipment in poor condition was to be replaced to allow the hotel to run efficiently and to avoid future downtime. This included Boilers, AHUs, Extract Fans, BMS and Electrical Distribution Boards.
  • Mastertech Supplied and Installed new Fan Coil Units to the Reception Area of the Main House. In the Reception, New Ventilation Ductwork c/w Cladding, VCD’s & Grilles were installed.
  • Mastertech upgraded all Chilled, Heating and Cold-Water Pumps in the building. This improved the Heating and Cooling of the building massively.
  • Mastertech Supplied and Installed over 100no. New Fire Smoke Dampers and Panels throughout multiple buildings to bring the Hotel to current European Standards.
  • A complete Electrical Package was Supplied and Installed by Mastertech, this included power supplies to all New Mechanical Equipment, New Indoor and Outdoor Lighting Fixtures, Security Systems, Electric Car Chargers in the Car Park, Fire Alarm and Data Cables.
  • All new equipment installed by Mastertech was commissioned by our specialists, commissioning certs were compiled into a detailed Operation & Maintenance Manual ready for Handover to the Client.

Other Projects

LEADING FOOD RETAIL, WHOLESALE AND FOODSERVICE COMPANY

LEADING FOOD RETAIL, WHOLESALE AND FOODSERVICE COMPANY

Dublin 6

Zero Latency in Pavilions Swords

ZERO LATENCY

Pavilions Swords

HAVAS

HAVAS

48 – 50 Cuffe Street, Dublin 2, Co. Dublin

Our Lady's Hospital Navan/Navan General Hospital

OUR LADY’S HOSPITAL, NAVAN

Moathill, Navan, Co. Meath

SONICA FIRST LANDINGS

FIRST LANDINGS - SKERRIES

Ardla, Skerries, Co. Dublin

GUINNESS ENTERPRISE CENTRE

GUINNESS ENTERPRISE CENTRE

Taylor’s Lane, Dublin 8, Co. Dublin